Name: | Description: | Size: | Format: | |
---|---|---|---|---|
996.43 KB | Adobe PDF |
Advisor(s)
Abstract(s)
Madeira, like many mountainous volcanic islands, is susceptible to flash floods.
Throughout its history, about 40 large events resulted in more than 1200 victims
and countless damages. Recently, urban areas expanded greatly, leading to a
higher exposure of the population to flash floods. In order to analyse ways to
reduce vulnerability and decrease hazard in the urbanised, flash flood prone
watershed of the Machico River, the construction of detention basins (DB) is
simulated. A hydrological and hydraulic model was performed to determine if
they would be a viable option to protect downstream populations. Modelling
suggests that two 12 m high outlet structures, and a storage capacity of
111 298 m3 (DB1) and 121 095 m3 (DB2), would reduce peak discharge by 72%,
from a precipitation event with a return period of 100 years. Two identified sen sitive Sections (S) had their fill rates reduced from 130.6% to 79.6% (S1) and
from 128.6% to 33.4% (S2), thus preventing channel overflow. A concise eco nomic analysis was made in terms of implementation and maintenance costs, as
well as a SWOT analysis highlighting that DB should be regarded as a viable
engineering solution to reduce vulnerability to flash floods hazards in volcanic
islands with small, steep, and urbanised watersheds.
Description
Keywords
100-year return period Extreme rainfall Hydrologic and hydraulic modelling Peak discharge attenuation Madeira (Portugal) . Faculdade de Ciências Exatas e da Engenharia
Citation
Vieira, I., Barreto, V., Figueira, C., Lousada, S., & Prada, S. (2018). The use of detention basins to reduce flash flood hazard in small and steep volcanic watersheds–a simulation from Madeira Island. Journal of Flood Risk Management, 11, S930-S942. https://doi.org/10.1111/jfr3.12285
Publisher
Wiley Open Access